|
National
|
| Tn1 |
Government’s 10 Year Plan for Transport –Department for Transport
| 2000 |
| Tn2 |
The Future of Transport, a network for 2030 - Department for Transport
| July 04 |
| Tn3 |
Regional Spatial Strategies: Guide to Producing Regional Transport Strategies
| July 06 |
| Tn3A |
Guide to producing Regional Transport Strategies
| April 03 |
| Tn4 |
Regional funding allocations advice, Treasury
| July 05 |
| Tn5 |
IHT for DfT re demand management
| 2004 |
| Tn6 |
The Future of Air Transport -Department for Transport
| Dec 03 |
| Tn6A |
The Future of Air Transport Progress Report–Department for Transport
| Dec 2006 |
| Tn7 |
A Targeted Programme of Improvements England - Department for Transport
| July 98 |
| Tn8 |
A Targeted Programme of Improvements: London orbital –Department of Transport
| July 98 |
| Tn9 |
A Targeted Programme of Improvements: London –Department of Transport
| July 98 |
| Tn10 |
A Targeted Programme of Improvements: South East –Department of Transport
| July 98 |
| Tn11 |
Business Plan 2006, Network Rail
| 2006 |
| Tn12 |
Network Rail Initial Strategy Business Plan 2009 – 2014
| June 06 |
| Tn13 |
The Future of Rail –White Paper
| July 04 |
| Tn14 |
The Strategic Plan 2003, Platform for Progress- Strategic Rail Authority
| Jan 03 |
| Tn15 |
Everyone’s Railway. The wider case for Rail – Strategic Rail Authority
| Sep 03 |
| Tn16 |
Managing Our Roads – DfT
| July 03 |
| Tn17 |
Feasibility Study into Paying for Road Use-DfT
| July 04 |
| Tn18 |
Speech by Transport Secretary Alistair Darling to Social Market Foundation on the need for road pricing and its potential benefits
| June 05 |
| Tn19 |
Consumer Behaviour and Pricing Structures: Final Report on Qualitative Research
| March 06 |
| Tn20 |
Government Response to Select Committee on Road Pricing
| July 05 |
| Tn21 |
House of Commons: Transport Committee: Road Pricing The Next Steps: Seventh Report of Session 2004-2005
| March 05 |
| Tn22 |
Ports Policy Review Discussion Document – DFT
| May 06 |
| Tn23 |
UK Port Demands Forecast to 2030: Final Report for Department of Transport– MDS Transmodal Limited
| May 06 |
| Tn24 |
Opportunities for Ports in Local Authority Ownership: A Review of Municipal Ports in England and Wales
| May 06 |
| Tn25 |
Speech by Minister of State for Transport Dr Stephen Ladyman to Ports Policy Review Confererence
| March 06 |
| Tn26 |
Speech to Confederation of Passenger Transport by RT Hon Alistair Darling
| Jan 06 |
| Tn27 |
Bus Priority: The Way Ahead: Resource Pack 2
| Dec 04 |
| Tn28 |
National Cycle Strategy – Department for Transport
| 1996 |
| Tn29 |
Making the Connections: Final Report on Transport and Social Exclusion -Social Exclusion Unit
| Feb 03 |
| Tn30 |
Tempro Planning Data Guidance Note – WSP for DfT
| Sep 2006 |
| Tn31 |
Freight Route Utilisation Strategy, Draft for consultation – Network Rail
| Sep 2006 |
| Tn32 |
Review of public attitudes to climate change and transport: Summary report – Dft Study
| July 2006 |
| Tn33 |
Eddington Transport Study: Main Report
| Dec 2006 |
| Tn33A |
Eddington Transport Study: Advice to Government
| Dec 2006 |
| Tn33B |
Eddington Transport Study covering letter to panel secretary
| Dec 2006 |
| Tn33B |
Eddington Transport Study covering letter to panel secretary
| Dec 2006 |
| Tn34 |
Steering through change:winning the debate on road pricing- Speech by Rt.Hon Douglas Alexander, Secretary of State for Transport, to the Institute for Public Policy Research
| 4 12 2006 |
| Tn35 |
Strategic Rail Freight Interchange Policy
| 14 10 2005 |
| Tn36 |
Letter about the Status of the SRA Strategic Freight Interchange Policy
| March 2004 |
| |
|
Regional
|
| Tr1 |
Technical Note on Transport – SEERA
| March 06 |
| Tr1B |
South East England Regional Transport Board: Prioritisation Methodology – Guidance Note Version 1 - SEERA
| May 2006 |
| Tr1A |
Annex to Technical Note on Transport – SEERA
| Nov 2006 |
| Tr1C |
Regional Transport Prioritisation Framework: Intervention Information Form July 2006 – SEERA
| July 2006 |
| Tr1D |
SEERA briefing note to the Panel of Inspectors: South East Regional Transportation Prioritisation and Programme 2006- 2016
| Jan 2007 |
| Tr2 |
Regional Funding Advice Response from Department for Transport
| July 06 |
| Tr3 |
Regional Funding Advice from Assembly to DfT
| Jan 06 |
| Tr4 |
Application of a Methodology for Prioritising and Ranking Regional Transport Management and Investment Priorities in South East England, Atkins for SEERA
| Dec 04 |
| Tr5 |
Development of a Methodology for the Prioritisation and Ranking of Regional Transport Management and Investment Priorities in South East England, SEERA
| June 04 |
| Tr6 |
Meeting the Infrastucture Needs of the South East Initial Papers for Discussion- South East Counties, PriceWaterhouseCoopers
| Jan 05 |
| Tr7 |
Infrastructure in the South East - Government Office of the South East
| March 05 |
| Tr8 |
Keep the South East Moving - Working paper three -Commission on Sustainable Development in the South East - Institute for Public Policy Research
| Jan 05 |
| Tr9 |
The Implications of the Aviation White Paper for South East England: Understanding the Evidence Base: Final Report –Roger Tym and Partners
| May 05 |
| Tr10 |
The Implications of the Aviation White Paper for South East England: Understanding the Evidence Base: Executive Summary –Roger Tym and Partners
| April 05 |
| Tr11 |
South East England, London and East of England Regional Ports Study:Final Report – WSP, Baxter Eadie Ltd, Marcial Echenique and Partners and the SQW/BBP Alliance (for SEAPLAG)
| June 02 |
| Tr12 |
Express Bus and Coach Summit
| Nov 03 |
| Tr13 |
Review of Regional Parking Standards, MVA for SEERA
| Oct 05 |
| Tr14 |
South East Parking Standards, Harrison Webb for SEERA
| May 03 |
| Tr15 |
Rail Data Analysis
| |
| Tr16 |
A34 North from Southampton Scoping Study, and SEERA response
| Apr/Aug 04 |
| Tr17 |
Transport Solutions around London, ORBIT, and SEERA response
| N 02/Ap 03 |
| Tr18 |
London to South West and South Wales SWARMMS, and SEERA response
| May/Aug 02 |
| Tr19 |
South Coast Corridor, and SEERA response
| Sep/Dec 02 |
| Tr20 |
Thames Valley TVMMS, and SEERA response
| Jan/Apr 03 |
| Tr21 |
National Rail Trends Yearbook 2004-2005 –Strategic Rail Authority
| June 05 |
| Tr22 |
Guidance on Accessibility Planning in Local Transport Plan –Department for Transport
| July 04 |
| Tr23 |
Technical Planning Guidance on Accessibility Planning in Local Transport Plans –Department for Transport
| Dec 04 |
| Tr24 |
Financial Planning Guidelines for Local Transport Plans: Consultation Paper – Department for Transport
| July 05 |
| Tr25 |
Network Statement High Speed 1(HS1) (Formerly the Channel Tunnel Rail Link) – CTRL (UK) Ltd, Union Railways (North) Ltd
| Nov 2006 |
| Tr26 |
Eastern Regional Planning Assessment for the railway
| Feb 2006 |
| Tr27 |
Southern Regional Planning Assessment for the railway
| Jan 2007 |
| Tr27A |
Statement by The Parliamentary Under-Secretary of State for Transport Tom Harris on the Southern Regional Planning Assessment for the railway and South Eastern Planning Assessment for the railway
| 11 12 2007 |
| Tr28 |
South Eastern Planning Assessment for the railway
| Jan 2007 |
| |
|
Sub-Regional
|
| Ts1 |
Kent Thameside Fastrack - Fastrack Development Strategy –Newletter Feb 2006
| Feb 06 |
| Ts2 |
Thames Gateway Transport Summary
| Nov 05 |
| Ts3 |
London Gateway Inspector’s Report Volume 1
| July 05 |
| Ts4 |
London Gateway Inspector’s Report Volume 2
| July 05 |
| Ts5 |
Dibden Bay Inspector’s Report
| April 04 |
| Ts6 |
Dibden Bay: Appendix to Inspector’s Report
| April 04 |
| Ts7 |
Oxford Bus Priority Document
| |
| Ts8 |
Great Western Main Line Route Utilisation Strategy - SRA
| June 05 |
| Ts9 |
Brighton Main Line Route Utilisation Strategy, SRA/DfT
| Feb 06 |
| Ts10 |
South West Main Line Route Utilisation Strategy, Network Rail
| March 06 |
| Ts11 |
Managing Travel Demand, Llewellyn Davies for SEERA
| Jan 03 |